The Renovation Timeline: What to Expect at Each Stage
- Radoslaw QA Solutions Ltd
- 6 days ago
- 20 min read

Planning a home renovation in Aberdeen can feel overwhelming if you’re not familiar with the process. Whether you’re upgrading a single room or doing a full home overhaul, understanding the timeline stage by stage will help you feel more confident and prepared. In this guide, we walk through each major stage of a renovation – from initial planning and budgeting to the final coat of paint and post-project care – with tips tailored to Aberdeen’s unique homes and climate. You’ll also see how working with an experienced local builder can make each step smoother and less stressful.
Stage 1: Planning and Budgeting
Define Your Goals and Scope: Start by deciding what you want to achieve. Are you renovating room-by-room – such as updating a kitchen or bathroom – or undertaking a whole-home upgrade? If you plan to live in the house during works, tackling one room at a time might make sense; larger structural changes often call for a whole-house approach. Some homeowners find a middle ground, doing a couple of areas together (for example, renovating two bedrooms or a kitchen and adjoining dining room simultaneously). Clarifying your project’s scope will shape the rest of your plan.
Set a Realistic Budget: Determine how much you’re willing to spend and build in a contingency (typically around 10–15%) for unexpected costs. Consider costs for materials, labor, permits, and a buffer for surprises (especially in older Aberdeen homes that might hide quirks behind the walls). Prioritise what’s most important to you – for instance, allocate more budget to a dream kitchen suite, and know where you’re willing to opt for cost-effective choices.
Initial Consultations: It helps to consult professionals early. Meet with a reputable builder or renovation specialist to discuss your ideas and get rough estimates. A builder with local Aberdeen experience can provide insight into typical costs and challenges in the area (for example, working with granite walls or dealing with weather delays). They can also advise if you’ll need an architect or structural engineer for your plans. At this stage, a home survey is wise, especially for older granite or timber-framed houses – Aberdeen’s damp climate means issues like wood rot may lurk unseen, and addressing structural problems early can save money and headaches down the line.
Aberdeen Considerations: In “The Granite City,” many homes are constructed from sturdy granite. This wonderful stone gives Aberdeen homes character and longevity, but it’s notoriously hard to alter. If your renovation involves knocking through a granite wall or extending a granite property, careful planning is needed to ensure the work is feasible. An experienced builder will know how to handle granite construction challenges without compromising your home’s structural integrity or charm. Also keep Aberdeen’s weather in mind during planning – heavy rain, wind, or winter cold can affect the renovation schedule, so plan your timeline with some weather flexibility built in (major projects are often at the mercy of the weather and other unexpected issues).
Stage 2: Design and Approvals
Design Development: With clear goals and a budget in place, the next stage is to nail down the design details. This might involve working with an architect or interior designer, or using your builder’s design services, to create layout plans and choose materials. For example, if renovating a kitchen, you’ll decide on the new layout (perhaps open-plan or adding an island), cabinetry style, and appliances placement. For a bathroom, you’ll plan the fixture locations (tub, shower, vanity) and consider plumbing constraints. A loft conversion design will focus on structural elements like adding dormer windows or skylights, a staircase, and ensuring ample insulation and headroom. Throughout design, consider both aesthetics and function – how can you improve your home’s comfort, energy efficiency, and value?
Local Permits and Regulations: Aberdeen City (like the rest of Scotland) has specific building regulations and planning laws you must follow. Early in design, determine what permissions are required:
Planning Permission: This is needed if you are altering the exterior appearance or expanding the building (for instance, adding an extension or dormer, or significant changes in a conservation area). Many Aberdeen homes in historic districts or conservation areas have guidelines to preserve their character. If your property is in a protected area or is a listed building, there may be limits on changes to façades, windows, or materials. Engaging with the local planning authority early is key – discussing your proposals with Aberdeen City Council’s planners at the outset can help flag any issues and streamline approvals. They may require that an extension complements the original granite or that windows match traditional styles, for example.
Building Warrant: In Scotland, a Building Warrant is legally required before you start almost any building work, including internal alterations, structural changes, conversions, and even demolitions. Essentially, it’s the council’s approval of your technical plans (structural safety, fire safety, insulation, plumbing, etc.). You or your architect will submit detailed drawings and specifications to the building standards department for this warrant. Don’t skip this step – it’s not only about safety and compliance, but also future peace of mind. If you ever sell your home, solicitors will ask for proof that renovations had the proper permissions; lacking a required warrant or completion certificate could jeopardise a sale or reduce your property’s value. Working with professionals greatly helps here: experienced builders like Sharpsaw will advise you on what permissions are needed and ensure all work meets building regulations, from loft conversions to structural alterations. They coordinate with architects and inspectors so your project is fully compliant and built to last.
Approval Process: Factor time for these approvals into your timeline. Planning permission decisions can take a couple of months (8–12 weeks is typical for local authorities), and building warrant approval time can vary as well. Sometimes you can apply for warrants concurrently with planning. Patience is important – it may feel like paperwork slows down progress, but securing the proper approvals protects you in the long run and ensures the renovation is done right. Your builder can also help by providing any technical details needed, and in many cases, they’ll handle communications with the council on your behalf.

Stage 3: Pre-Construction Preparation
With designs finalized and permits in hand, you’re ready to prepare for the construction phase. This stage is all about getting everything organised before the real messy work begins:
Selecting Contractors and Finalising Contracts: If you haven’t already, choose the main contractor/builder for the job (you may have done this earlier and involved them during design). For a comprehensive project, a general contractor, like Sharpsaw Joinery&Builders, will coordinate all the trades (joiners, plumbers, electricians, etc.) for you. If you’re managing it yourself, now is the time to line up trusted tradespeople for each aspect of the work. Ensure you have a clear contract or written agreement detailing the scope of work, payment schedule, timeline, and warranties. This documentation helps everyone stay on the same page.
Scheduling and Ordering: A detailed schedule of works is created, often by the builder. This is essentially the renovation timeline in action – it sequences tasks and trades in logical order and allocates time for each stage. For example, it will schedule when demolition starts, when electricians will do wiring, when plastering happens, and so on. Ordering materials in advance is crucial at this point. Items with long lead times (like custom windows, kitchen cabinets, or specialty tiles) should be ordered so they arrive when needed. Ensuring materials arrive at the right time keeps the project flowing without downtime. A good contractor will manage this procurement and scheduling puzzle behind the scenes, so you’re not stuck waiting on a part. Poor coordination can cause work to overlap or stall, leading to delays – which is why having an expert manage the timeline and logistics is invaluable.
Site Preparation: If you’re renovating part of the home while living in it, you’ll need to prepare the space. This might mean packing up and moving furniture out of work areas, setting up dust protection, and establishing a temporary kitchen or bathroom if those rooms are being redone. Professionals typically help with protecting flooring or sealing off zones with plastic sheeting to contain dust. If it’s a whole-home renovation, you might consider moving out temporarily or sectioning the project so you can live in one part of the house while another part is under construction (bearing in mind this can extend the timeline). Discuss these logistics with your builder. They will also handle obtaining any final insurance or inspections needed before work (for instance, a building control officer may want to review certain pre-construction items).
Neighbourhood Notices: Although not a formal “stage,” it’s a good practice at this prep phase to inform your neighbours of the upcoming works, especially in Aberdeen’s close-knit communities or terrace houses. Letting them know the schedule and assuring them that a professional crew will minimise disruption can maintain good relations – and it’s just courteous. In some cases, if scaffolding or skips (dumpsters) will occupy shared or street space, permits and neighbour notifications are legally required.
Finally, be mentally prepared that even with meticulous planning, renovations can bring surprises. Hidden issues (like unforeseen structural defects or old wiring that needs full replacement) might surface once work begins. Your timeline may need adjusting – build in a little buffer for the unexpected. And remember, Aberdeen’s weather can be unpredictable; a stretch of heavy rain might delay exterior work. A seasoned builder will factor these possibilities into the schedule and communicate with you about any changes. The goal at this stage is to set a strong foundation for the work so that once hammers start swinging, everything goes as smoothly as possible.
Stage 4: Construction and Building Work
This is the stage where your project visibly comes to life – walls come down or go up, and your space transforms step by step. The construction phase can be noisy and dusty, but knowing what’s happening and why at each step will help you stay calm and informed. Generally, the construction stage progresses in a logical order from “rough” work to fine finishing. Here’s what to expect:
Demolition & Structural Work: Construction usually begins with any necessary demolition and structural alterations. This could mean stripping out old fixtures and finishes (removing old cabinetry, tiles, carpets, etc.) and knocking down walls or removing structures that won’t remain. The priority is to ensure the building is structurally sound before adding new elements. Builders will reinforce or repair structural elements as needed – for example, installing beams if a load-bearing wall is removed, repairing any rotten roof rafters, or stabilising a subsiding floor. It’s crucial to address such issues first so the house is safe and solid. In Aberdeen, making a house structurally sound might also involve dealing with that granite – cutting an opening in a granite wall for a new doorway or extension is a task requiring specialised tools and skill. Trust the professionals here; they will often bring in structural engineers and use techniques that protect the integrity of your stone or brickwork.
Making It Weathertight: If your renovation includes adding to the building (an extension, new roof section, dormer loft conversion, etc.), the next step is to get the new structure built and sealed against the elements. Aberdeen’s weather can be harsh, so it’s vital to make the building weathertight as soon as possible. This stage includes putting on roof coverings, installing windows and exterior doors, and finishing external walls. For instance, if you added an extension, the builders will construct the walls (perhaps using materials that complement your granite or brick), put on the roof, and install windows/doors so that wind and rain stay out. Once the “external envelope” of the house is secure and dry, the focus can shift fully to indoor work without worrying about new work getting ruined by leaks.
First Fix – Plumbing, Electrical, and Carpentry: “First fix” refers to the installation of all the unseen elements inside walls, floors, and ceilings that make your home functional. After any new structures are up, electricians run wiring for outlets, lighting, and appliances, and plumbers lay pipes for water, heating, and drainage. Joiners (carpenters) frame new internal walls or partitions (e.g. stud walls for a reconfigured layout), and install things like subfloors or reinforcement where needed. In a kitchen renovation, this is when old wiring and plumbing may be replaced or moved to suit the new layout (for example, wiring for an oven or plumbing for a relocated sink). In a bathroom, first fix includes running new hot/cold water lines, drainage for the shower/bath, and any ventilation ducts. For a loft conversion, first fix involves reinforcing floor joists, fitting insulation, and roughing in electrics and perhaps heating pipes for the new room. Essentially, it’s all the infrastructure that will later be hidden behind walls or under floors. During this phase, there may also be inspections by building officials to ensure structural work and rough-ins meet building codes and the approved plans.
Plastering and Drywall: Once the first-fix work is complete and everything tests out okay (no leaks in pipes, electrical circuits safe, etc.), the next step is to close up the walls and ceilings. Builders will install plasterboard (drywall) on new or opened-up walls and ceilings, then plaster or tape and finish them to create a smooth surface. In older Aberdeen homes, there may be areas of traditional plaster; skilled plasterers will repair or blend new sections with old as needed. Getting a good plaster finish is important as it sets the stage for all your decorating. At this point, your interior starts looking like rooms again rather than construction zones.
Second Fix – Fixtures and Joinery: Now the focus shifts to installing the visible features and fixtures – the things you’ll touch and use daily. Second fix carpentry includes hanging doors, fitting skirting boards and molding, installing built-in shelving or wardrobes, and fitting window sills. Electricians return to fit light switches, plug sockets, and light fixtures, and to connect appliances. Plumbers come back to install sinks, toilets, radiators, and hook up your kitchen appliances and bathroom sanitaryware. For example, in that kitchen renovation, this is when your new kitchen cabinets are installed, along with the countertop, sink, and appliances. In the bathroom, your bathtub, shower fixtures, vanity, and toilet are fitted and sealed. If you’ve added a loft room, second fix includes installing staircase handrails, doors, and lighting. You will really see your design take shape now – rooms have their cabinets, fixtures, and hardware in place, though perhaps not yet decorated. At this stage, systems are made operational too: the heating system might be turned on and tested, electrical systems certified, etc. The home becomes fully functional again piece by piece.
Finishing Touches (Decorating): With most fixtures in place, the final construction stage is finishing surfaces and decorating. Painters will apply paint or wallpaper to the newly plastered walls and ceilings. New flooring is laid if it hasn’t been already (some types of flooring might go in just before second fix, depending on the project, and then be protected; others are better left until now). Carpets, hardwood floors, or tiles are finished up. Any final carpentry trim is done. Essentially, anything that could have been damaged by earlier heavy works is done last, so it stays pristine. You’ll see the aesthetic details come together – the wall colors, the gleam of new tiles, the finish on your cabinets. This is the exciting part where your vision fully materialises. By the end of this stage, the renovation itself is complete.
Throughout the construction process, communication with your builder is key. A good contractor will keep you updated on progress and upcoming steps, so you “always know what’s happening next”. If issues arise (for example, discovering old wiring that must be replaced), they should consult you on the plan and any budget impacts before proceeding. Keep a contingency fund for such surprises and try to be flexible – almost every project will have a hiccup or two, but professionals handle these challenges regularly and will aim to keep your project on track.

Stage 5: Finishing, Inspection and Handover
With construction work done, there are a few formalities and final tasks before you can truly enjoy your renewed space. This stage is all about quality control, official sign-offs, and introducing you to your “new” home:
Snagging (Punch List): Before declaring the project complete, walk through the renovated areas with your builder to identify any “snags” – minor defects or touch-ups that need attention. This could be little things like a cabinet door that isn’t aligned, a bit of paint missed behind a radiator, or a light fixture not working due to a loose connection. It’s common to find a handful of these minor issues; this is your chance to have them fixed. A reputable builder will welcome the opportunity to put things right as part of the agreed contract. Think of snagging as a quality assurance step – everything should meet the standard you expected. It’s easier to get these sorted now, before you move fully back into using the space. Don’t be shy about speaking up; you should end up completely happy with the workmanship. (Pro tip: as you’ve been living through the renovation, you might keep a running list of any little issues you spot, so nothing is forgotten at the end.) This is your final check to ensure there are no remaining problems or subpar finishes.
Official Inspections and Certificates: If you had building permits (warrant) and planning approvals, the final inspection from the building inspector will typically happen at this stage. They may visit to verify that the work conforms to the approved plans and building regulations. Assuming everything is in order, the council will issue a Completion Certificate or similar documentation. This piece of paper is important – it formally closes the permit and is proof that your renovation was done to code. As mentioned earlier, having this certificate will be crucial when selling or refinancing your home. Your builder or architect often coordinates the inspector’s visit and can help address any last-minute tweaks the inspector might request. With experienced builders who plan carefully, such projects usually pass on the first go because compliance has been considered throughout. If you’re renovating in stages (room by room over a long period), some of these approvals might be incremental, but major works usually conclude with this sign-off.
Handover and Orientation: Once the space is deemed complete and all paperwork is wrapped up, your contractor will formally hand over the project to you. This might simply mean a congratulatory walkthrough where they “hand you the keys” (figuratively, or literally if, say, a new extension has its own entrance). A professional builder will also brief you on any new systems or maintenance. For example, they’ll show you where the new boiler or fuse box is and how to operate them if they were part of the renovation. They may provide instruction manuals or warranties for new equipment installed (appliances, heating systems, etc.). If any part of the project included specialist installations (underfloor heating, security systems, etc.), you’ll get a rundown on those. Essentially, they ensure you’re comfortable with everything in your revamped home.
Cleanup: By the end of construction, the crew will remove tools, scaffolding, and debris. A good contractor will include a thorough cleanup – often a professional deep cleaning of the renovation area – so you aren’t left with dust on every surface. If it’s a large project, sometimes a separate cleaning team comes in. When they leave, your home should be clean, safe, and ready to use. (It might smell like fresh paint for a short while – keep windows open to air it out.)
Now take a moment to appreciate the transformation! Comparing your new space to the “before” can be truly satisfying. You’ve made it through the major renovation process, and your home is now upgraded in style, comfort, and value.
Stage 6: Post-Project Care and Maintenance
Renovation doesn’t quite end the day the builders leave. Post-project care ensures that your investment stays in top condition and any minor issues that surface after move-in are addressed. Here’s how to handle the aftermath gracefully:
Warranty and Follow-up: Most reputable builders provide a warranty or guarantee period for their work. This might be a formal warranty (for example, 6 or 12 months where they’ll fix any defects in workmanship) or simply a goodwill assurance. Clarify this with your builder at handover. If, during the first weeks or months of using your renovated space, you notice something like a small plumbing drip, a door that sticks as humidity changes, or settling cracks in new plaster, you should be able to call your builder and have it rectified. Experienced companies like Sharpsaw take pride in their craftsmanship and won’t disappear after completion – they want you to be happy long-term. Don’t hesitate to reach out with questions or concerns after the project; professionals prefer to address issues early rather than have an unhappy client.
Maintenance Tips: The builder may give you advice on caring for new materials and finishes. Follow any guidance for cleaning (for instance, use the recommended cleaner on your new granite countertops or hardwood floors to avoid damage). If you have new timber decking or exterior woodwork as part of the reno, you might need to re-seal or paint it after a certain period. Similarly, freshly plastered and painted walls sometimes benefit from gentle treatment initially (e.g., using mild detergent for any scuffs). For bathrooms, keeping up with caulk and grout maintenance is wise – Aberdeen’s wet weather and high humidity in bathrooms can invite mold if seals are broken. Regular maintenance will prolong the life of your renovations.
Seasonal Check-ups: Aberdeen is known for its wet and chilly climate. After your project, make a habit of seasonal check-ups on key elements. For example, if you added roofing or new gutters, clear the gutters and check for any leaks before and after winter. If insulation was added, ensure your home is staying warm efficiently; if not, consult the installer. Extreme temperature changes can sometimes cause materials to expand or contract – that might produce the occasional drywall nail pop or squeaky floorboard; minor adjustments can fix these. Also, if your renovation included garden landscaping or external work, the freeze-thaw cycle can be tough on concrete and stone, so inspect patios or paths for cracks come spring.
Enjoyment and Improvements: Now’s the time to fully enjoy your improved home. Decorate and furnish the new spaces to your liking, and invite friends or family to show off the “new” house. Live in it for a while to understand how the changes suit your lifestyle. Sometimes, homeowners plan additional phases – maybe you renovated the downstairs this year and plan to tackle upstairs bedrooms next year. Use the knowledge you gained in one project to make the next even smoother. If working room-by-room, each completed room will give you confidence for the next.
Finally, reflect on the journey: from those early planning days to the final result. Renovations can be complex, but you did it! And if it felt easy, perhaps it’s because you partnered with the right team. Working with experienced builders like Sharpsaw means you had guidance at every turn – from realistic planning and obtaining permits, to quality execution and aftercare. As a homeowner, that support turns what could be an overwhelming process into an exciting transformation of your living space.
Aberdeen Homeowners’ Advantage: By going through the proper stages and having experts on board, you’ve ensured your renovation respects Aberdeen’s local building norms, weathered the local climate considerations, and preserved the character of your home. All that’s left is to enjoy the improved comfort and style of your upgraded space, knowing you’re well-prepared for many years of happy home life ahead.
Room-by-Room Upgrades vs. Whole-Home Renovations
It’s worth highlighting how the process might look for individual room renovations compared to a full home makeover, since many Aberdeen homeowners choose to improve their property gradually, one space at a time. The core stages of the timeline we described still apply to any renovation, but the scope and some considerations differ:
Kitchen Renovations: A kitchen update is one of the most popular projects (and something Sharpsaw specialises in). It typically involves heavy planning on layout and utilities. During design, you’ll choose cabinetry, appliances, and possibly knock down walls to achieve an open-plan kitchen-diner (common in Aberdeen’s granite homes where traditional layouts were more closed-off). Fortunately, a straight kitchen refit often doesn’t require planning permission if you’re not altering the building externally – but it will require a building warrant for extensive electrical or plumbing changes. The timeline for a single kitchen renovation is shorter (often a few weeks of construction) and you might be able to live at home, setting up a temporary cooking area elsewhere. During construction, expect a brief period of no water or power in the kitchen as old fixtures are removed and new systems installed. A good contractor will coordinate plumbers, electricians, joiners (cabinet installers), and tilers in quick succession so you’re not without a kitchen for long. By doing it room-by-room, you contain the mess to that area. Just remember to seal off the cooking area to minimise dust traveling to the rest of the house!
Bathroom Upgrades: Renovating a bathroom can greatly improve comfort (who doesn’t love a modern shower or a cozy heated towel rail on a cold Aberdeen morning?). Bathroom remodels also usually avoid planning permission hurdles (unless you’re adding a new window or expanding the space), but do require adherence to building standards for electrical safety (especially around wet areas) and proper plumbing. These projects involve removing old tiles and fixtures, possibly updating the plumbing (old pipes in Aberdeen’s older flats and homes might be due for replacement), installing a new bath/shower, toilet, sink, and then tiling and decorating. It’s a smaller space, but waterproofing and tiling make it a detail-oriented job. A single bathroom can often be renovated in 1-2 weeks of intensive work, though having a second bathroom to use is ideal during that time. If not, you may arrange a temporary solution with your builder or plan to stay elsewhere for a few days when the toilet is out of action. Once finished, you’ll have an updated bathroom that’s easier to maintain and adds value to your home.
Loft Conversions: Converting an underused attic into a livable loft is very popular in Aberdeen, as many traditional houses have steep roofs perfect for extra rooms. Loft conversions are a bit more complex: they almost always need a building warrant (structural changes, new staircase, etc.) and sometimes planning permission – for example, if you’re adding dormer windows or altering the roof line significantly, the council will need to approve the change to the exterior. Working within the roof also means dealing with structural reinforcements (floor joists must support living space) and stringent fire safety rules (you may need to install fire-rated doors or even a sprinkler system, per building regulations). The construction in a loft conversion starts within the roof space, so it might be less disruptive to your daily life until the builders “break through” to create the stairwell into your living area – at that point, dust and noise will increase. Insulation is a big part of this job (to keep the new room warm in winter and cool in summer). While a single-room project, a loft conversion can span several weeks to a few months, depending on complexity. The result is essentially a whole new room (or even an entire new floor) added to your house, which is a tremendous upgrade. Builders like Sharpsaw, experienced in loft conversions, coordinate the sequence of work tightly – from initial structural work and weatherproofing (adding any dormer and windows early so rain stays out) to first-fix electrics/plumbing, insulation, walling, and finishing. It’s a big project in a confined space, but the transformation is usually one of the most dramatic.
Whole-Home Renovation: This is when you renovate multiple rooms or the entire house in one concerted project. The timeline is longer overall, but it can be more time-efficient than doing many separate smaller projects spread out over years. For instance, instead of renovating kitchen, then later doing living room, then bedrooms in separate jobs, you bundle them. This way, tasks like rewiring can be done for the whole house at once, which is often more efficient. You might move out entirely for a couple of months and let the crew take over the house – which can actually shorten the elapsed time since they aren’t working around occupants. Whole-home projects require thorough planning to coordinate all the pieces (multiple rooms, possibly an extension, etc.), but you only go through the disruption once. In Aberdeen, we see whole-home renovations especially when someone buys an older property and wants to modernise everything (perhaps updating an aged granite house with new plumbing, heating, open-plan layouts and all new finishes in one go). The advantage is a fully cohesive result – you can ensure the design is consistent throughout the house and all systems (electrical, heating) are updated together. The disadvantage is the upfront cost and having to vacate (in most cases) during work. However, with a trustworthy builder managing the project, homeowners can find the process quite streamlined. Professionals schedule the workflow such that, for example, all demolition happens across the house first, then all electrical rough-ins across the house, etc., which can be faster than mobilizing separate mini-projects repeatedly. Sharpsaw, for instance, has the capacity to handle full-property overhauls, coordinating trades and timeline so that the process is as seamless and hassle-free as possible for you.
In summary, room-by-room renovations are like bite-size projects – easier to budget for one at a time and less initial upheaval – while full-home renovations are a bigger leap but can be more efficient and transformative in one go. Aberdeen homeowners often choose a path based on their circumstances: living in the home and budgeting gradually might favor a phased, room-by-room approach; acquiring a fixer-upper or requiring major changes for an old home might favor doing it all at once. Regardless of the approach, the same renovation stages (planning, design, construction, finishing, etc.) will apply, just scaled to the project size. And in all cases, collaborating with experienced professionals ensures that whether you renovate one room or ten, the process is managed safely, legally, and with craftsmanship.

Conclusion: A Smoother Renovation with the Right Team
Renovating your home is a journey – and like any journey, it’s much easier with an expert guide. By understanding the timeline and what to expect at each stage, you’ve taken the first step toward a successful project. From the careful planning and design stages, through the buzz of construction, to the satisfying moment of completion and beyond, each phase has its challenges and excitement. Aberdeen, with its unique granite architecture and local regulations, adds its own flavor to the process, but it’s nothing a seasoned local builder can’t handle.
The key takeaway? You don’t have to go it alone. Working with experienced builders like Sharpsaw Joinery & Builders means having a partner every step of the way. We help you avoid common pitfalls, like unclear budgeting or overlooked permits, by bringing our expertise to your project from day one. Our team has navigated Aberdeen’s planning permissions and renovated its beautiful granite homes; we’ve managed tight schedules around North-East Scotland weather, and coordinated trusted tradespeople to bring countless homeowners’ visions to life. We believe renovations can be exciting and rewarding, not stressful – and a clear plan and open communication make it possible.
Whether you’re dreaming of a modern open-plan kitchen in a Victorian granite terrace, a luxurious new bathroom, a cozy converted loft, or a top-to-bottom home makeover, following a structured timeline will keep you on track. And with the right professionals handling the heavy lifting, you can focus on the fun parts – choosing your finishes, watching the transformation, and planning how to enjoy your improved home. In the end, seeing your Aberdeen home renewed to better suit your lifestyle is incredibly satisfying.
Thinking of renovating? Feel free to reach out to our friendly team at Sharpsaw. We’re here to share our local knowledge and turn your plans into reality with precision and care. Renovation is a big step, but with a roadmap in hand and the right crew on your side, you can embark on the journey with confidence. Here’s to making your dream home a reality, one stage at a time!